Identity

Identity Areas of improvement Operation Gaps Redefine Efficiency and Performance...

Initiate

Initiate Blueprint possibilities Study Possibilities Initiate solution research..

Innovate

Innovate Evolve a solution Framework Design a Solution Test and Optimize

Integrate

Integrate Seamlessly merge into existing system Support new systems....

Career @ i2wave


The Internet requires a rigorous development on a robust conceptual framework, one that can incorporate the business flow at all levels of the organization. Without developing a theoretical framework to examine the specifications of the application, development of an application will make very little progress in exploiting the potentials of this unique environment. Hence a clear defined procedure for application development has been adopted at I2wave

It is the fine mix of art and science that gives the software its inherent use. I2wave follows a solution centric approach backed by well-established systematic procedures.

We adopt a collaborative approach towards application development, which involves an active participation of various functional teams for a complete understanding of the requirements and a better definition of the key processes that needs to be incorporated into the application.

                          

 

The common development framework begins with the Project Initiation Phase, where the core requirements are stated. Content Review, target audience and the functional requirement study are conducted to derive the project objectives and form the initial stage of the requirement study. The existing process or system in place is studied and a complete report about the function, behavior, performance and interface of the existing system is documented. This marks the end of the analysis stage. All specifications are clarified and the requirement document is frozen.

With the project scope and requirements` confirmed during the project initiation and analysis stage, the design stage is initiated by the analysis of the integrated business model, where the functional roles and system parameters are viewed in relation. The GUI design and the screen interface are designed as per the stated needs. The project architecture is reviewed and finalized before proceeding to the next phase. The system is developed using various languages and development tools as preferred by the client.

Testing procedures like cross platform testing, load testing, stress test and analysis, integration testing, user acceptance testing are enforced on the developed system to study its behavior across various operational environments. The submission of the source code and the development documents marks the signoff phase of the project.

Copyright © i2wave Solutions. All rights reserved. 2010.